Arcadia Horse Farm

Logo

286 kW Project

Annual CO2 Impact
i

568,673

Fewer Miles Driven

384

Trees Planted

254,301

Lbs. of Coal Avoided

About the Project

Project Story

The system is sited on the rooftop of Arcadia Farms Indoor Riding Arena. Arcadia Farm is a 30-acre, 44-stall horse training and the premier boarding facility in Westchester County NY. The system will provide Arcadia Farm with an annual revenue stream to support their operations and emphasize their continued leadership in sustainability. Providing individuals and organizations in Con Edison Utility territory (NYC and most of Westchester) the option to support locally-produced, clean solar energy, this 268.8 kW DC system will provide power to over 38 households.

Sign Up

Contract Details

Contract Term

Enjoy savings for the life of the program.

Contract Type

10% Discount.

Cancellation Fees

Cancel anytime with 90 days notice.

Cancellation Info

No Fees.

Arcadia Horse Farm Image 1
Arcadia Horse Farm Image 2
Arcadia Horse Farm Image 3
Arcadia Horse Farm Image 4
Arcadia Horse Farm Image 5

Project Coverage Area

The map provides general information about the local area that is able to participate in the project. If the project is accepting subscribers, you will be able to join the project and support clean, local, more affordable power.

Neighborhoods and Cities Served *

All Con Edison customers

* This list is not exhaustive

Power Generation

Arcadia Horse Farm Project Expected Annual Generation

328,904

kWh of Clean Energy Produced Annually

568,673
Fewer Miles Driven
384
Trees Planted
254,301
Lbs. of Coal Avoided

The metrics shown above are based on the expected annual generation of this project and derived from the EPA greenhouse gas equivalencies calculator at https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator.