Hosted at Collt Manufacturing Inc., a woman-owned manufacturing facility since 1969 - this community solar parking canopy is the first of it's kind in the Town of Millis. The 220 kW system will provide power to over 22 residents and businesses and will create an added amenity and visible green initiative for staff and visitors of Collt. The 14' tall galvanized steel structure will have motion-sensored LED lighting underneath and will allow for tractor trailer clearance so that Collt's operations won't be disturbed.
Sign UpEnjoy savings for the life of the program.
10% Discount.
Cancel anytime with 180 days notice
No Fees.
The map provides general information about the local area that is able to participate in the project. If the project is accepting subscribers, you will be able to join the project and support clean, local, more affordable power.
kWh of Clean Energy Produced Annually
The metrics shown above are based on the expected annual generation of this project and derived from the EPA greenhouse gas equivalencies calculator at https://www.epa.gov/energy/greenhouse-gas-equivalencies-calculator.
Charges: $100.00
Credits Applied: $0.00
Amount Due: $100.00
Charges: $100.00
Credits Applied: -$100.00
Amount Due: $0.00
Generated: 1000 kWh
Credits: $100.00
Amount Due: $90.00
When the recipient signs onto a project, both you and the recipient will receive a check for ¤0.